Dearborn Plaza
Chicago, Illinois

Kohlman-Hill installed the plumbing systems in this 19 story 419,000 square foot building. The facility includes two lower levels of parking, retail spaces on first floor, 5 floors of dormitory rooms purpose built for a single private corporation, and office space for the top remaining floors.Hill Environmental Operations provides operating engineers for the entire facility. Architect: DeStefano and Partners, Ltd.
Consulting Engineer: Environmental System Design, Inc. General Contractor: James McHugh Construction Co. Complete: 2000
|