Chicago Tribune Freedom Center
Chicago, Illinois

Hill Mechanical Corp. is installing the heating, ventilating, and air conditioning system in the Chicago Tribune Distribution Center. The scope of work includes installing seven rooftop units totaling 560 tons of cooling. The work will be completed in two phases over two years to allow 24 hour access to the existing truck loading dock.

Hill Mechanical Corporation is also responsible for installing a compressed air system and ink distribution piping for the printing presses.


Architect:
Harding Ankarlo

Consulting Engineer:
Teng and Associates

General Contractor:
Turner Construction Company

Complete: 2002